Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Public Works Ian Projects

Learn about the ongoing Public Works repair projects to county roads and right of ways from damage caused by Hurricane Ian.

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 06/05/2023 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 06/02/2023 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 06/02/2023 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events. 

Read More

South Gulf Cove Parallel Locks Project News Image

South Gulf Cove Parallel Locks Project

Last Updated: 06/02/2023 Category: Coastal Current Phase: Design Development

Engineering design project of the South Gulf Cove Parallel Lock.

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 06/02/2023 Category: Parks And Recreation Current Phase: Planning and Project Approval

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Supervisor of Elections Warehouse News Image

Supervisor of Elections Warehouse Sales Tax Project

Last Updated: 06/02/2023 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites. 

Read More

Sheriff Administration and Hardened 911 Facility News Image

Sheriff Administration and Hardened 911 Facility Sales Tax Project

Last Updated: 06/02/2023 Category: Sales Tax Funded Category: County Facilities Current Phase: Design Development

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.

Read More

Landfill Scale House (Zemel Road) News Image

Landfill Scale House (Zemel Road)

Last Updated: 06/02/2023 Category: County Facilities Current Phase: Planning and Project Approval

The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.

Read More

Harold Avenue Generator Mitigation Grant

Harold Avenue Generator Mitigation Grant

Last Updated: 06/02/2023 Current Phase: Construction

This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center. 

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us