Last Updated: 05/04/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2024 Road and Bridge Paving Program
Last Updated: 05/04/2026 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving Program2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 05/04/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 05/04/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.Buena Vista Waterways Dredging Project
Last Updated: 05/04/2026 Category: Coastal Current Phase: Construction
Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU. The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.
Burnt Store Road East-West Connector
Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Harbor Boulevard Intersection Improvements
Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed 05/04/2026 Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardRiverside Drive Road Crossing Pipe Replacements
Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor Drive