Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/12/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkAlligator Creek Maintenance Dredge
Last Updated: 02/15/2025 Category: Coastal Current Phase: Design Development
Design, permit, dredge, and construction oversight for project certification of a maintenance dredge event of Alligator Creek channel.
Buena Vista Waterways Dredging Project
Last Updated: 02/15/2025 Category: Coastal Current Phase: Design Development
The Buena Vista Waterway Committee requested and received a dredging of the access and connector channels in 2016. Since then, new concerns of a need to restore safe navigation have been brought to the County’s attention.
Gulf Cove Interior Canal design and maintenance dredge project
Last Updated: 02/15/2025 Category: Coastal Current Phase: Design Development
Gulf Cove Interior Canal bathymetric survey and design project to -4'MLW. Gulf Cove Waterway MSBU requested work.Last Updated: 02/15/2025 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.South Gulf Cove Parallel Locks Project
Last Updated: 02/15/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 02/14/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 02/14/2025 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 02/14/2025 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.