Cochran Boulevard at Veterans Boulevard Intersection Improvements
Last Updated: 11/24/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 11/21/2025 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 35 culvert locations throughout the county that will have these grates installed.Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.East Port Water Reclamation Facility Expansion
Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Hillsborough Boulevard Water Main Project
Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 11/20/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayLast Updated: 11/20/2025 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 17 acres of Oyster Creek.2024 Road and Bridge Paving Program
Last Updated: 11/19/2025 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving ProgramLast Updated: 11/19/2025 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.