Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.
Disaster Recovery Projects DashboardEnglewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Last Updated: 09/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Mid-County Library Hurricane Repairs
Last Updated: 09/08/2025 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 09/08/2025 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 09/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Last Updated: 09/05/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Kings Hwy Harborview Rd Intersection Improvements
Last Updated: 09/05/2025 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Hillsborough Boulevard Water Main Project
Last Updated: 09/04/2025 Category: Utilities Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 09/03/2025 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.Last Updated: 08/29/2025 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.