Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 01/15/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Last Updated: 01/13/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Last Updated: 01/13/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Caring Way and Brinson Avenue Sidewalks
Last Updated: 01/13/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksLast Updated: 01/13/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Cochran Boulevard Reclaim Extension
Last Updated: 01/13/2025 Category: Utilities Current Phase: Construction
Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard.Last Updated: 01/13/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkEast Port Water Reclamation Facility Expansion
Last Updated: 01/13/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Fruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 01/13/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas Sidewalk