Atwater Street Sidewalk Project
            
            
          		 
            
            
            
          
Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Buena Vista Waterways Dredging Project
Last Updated: 10/29/2025 Category: Coastal Current Phase: Construction
Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU. The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.
         	Caring Way and Brinson Avenue Sidewalks
            
          		
            
            
          		 
            
            
            
          
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks
         	Cleveland Avenue Sidewalk Project
            
            
          		 
            
            
            
          
Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.
         	Disaster Recovery Site - Tom Adams Bridge
            
            
            
          		 
            
            
          
Last Updated: 10/29/2025 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.East Port Water Reclamation Facility Expansion
Last Updated: 10/29/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.
         	Fruitland Avenue and Avenue of the Americas Sidewalk project
            
          		
            
            
          		 
            
            
            
          
Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas SidewalkLast Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGasparilla Road Sidewalk (Boca Grande)
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCC


 
                           
                           
                           
                          
