Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
G.C. Herring Park Phase I News Image

G.C. Herring Park Phase I Sales Tax Project

Last Updated: 09/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan. 

Read More

Mid-County Library Hurricane Repairs

Mid-County Library Hurricane Repairs

Last Updated: 09/08/2025 Category: County Facilities Current Phase: Construction

Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy. 

Read More

Sunshine Lake/Sunrise Waterway Monitoring Program

Sunshine Lake/Sunrise Waterway Monitoring Program

Last Updated: 09/08/2025 Category: Other Current Phase: Construction

This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway. 

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 09/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 09/05/2025 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Kings Hwy Harborview Rd Intersection Improvements

Kings Hwy Harborview Rd Intersection Improvements

Last Updated: 09/05/2025 Category: Roadway Current Phase: Construction

Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening. 

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 09/04/2025 Category: Utilities Current Phase: Construction

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Cultural Center Replacement News Image

Cultural Center Replacement

Last Updated: 09/03/2025 Category: County Facilities Current Phase: Planning and Project Approval

The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.

Read More

EOC Expansion

EOC Expansion

Last Updated: 08/29/2025 Current Phase: Design Development

The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.

Read More