Learn about the ongoing Public Works repair projects to county roads and right of ways from damage caused by Hurricane Ian.
Harold Avenue Generator Mitigation Grant
Last Updated: 09/15/2023 Current Phase: Construction
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.
Placida West Boat Ramp Expansion
Last Updated: 09/14/2023 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Ainger Creek Boat Ramp Replacement
Last Updated: 09/14/2023 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.
Family Services Center - Phase 2
Last Updated: 09/14/2023 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction
Complete the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 will enable youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices will be constructed along with critical shared support facilities, maker space, and expanded services.Last Updated: 09/13/2023 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Caring Way and Brinson Avenue Sidewalks
Last Updated: 09/13/2023 Category: Sidewalks Current Phase: Planning and Project Approval
Caring Way and Brinson Avenue SidewalksNWPC Interior Canal Maintenance Dredge
Last Updated: 09/08/2023 Category: Coastal Current Phase: Construction
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.Buena Vista Exterior Dredge Project
Last Updated: 09/08/2023 Category: Coastal Current Phase: Design Development
Buena Vista Access and connector channels maintenance dredge design.Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 09/07/2023 Category: Bridges Current Phase: Design Development
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map.