Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Port Charlotte Beach Recreation Center
Last Updated: 09/16/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Riverside Boat Ramp Replacement
Last Updated: 09/16/2024 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 09/16/2024 Category: Roadway Current Phase: Design Development
Sandhill Blvd WideningSheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 09/16/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Veterans Boulevard Intersection Improvements
Last Updated: 09/16/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Bayshore Live Oak Park - West Fishing Pier
Last Updated: 09/13/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 09/13/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 09/13/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 09/13/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of a master plan through the park design process and phase 1 development.