South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 07/30/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Last Updated: 07/30/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock and Tender HouseLast Updated: 07/29/2026 Current Phase: Construction
Replacement of boardwalk at Oyster Creek Environmental Park.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsBallfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer FieldsBallfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Bayshore Live Oak Park - West Fishing Pier
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park Seawall ReplacementLast Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Design Development
Cedar Point Pier Replacement