Chamberlain Boulevard Sidewalk
Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 04/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkEnglewood East Amenity Replacement
Last Updated: 04/02/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Fruitland Avenue and Avenue of the Americas Sidewalk project
Last Updated: 04/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout
Fruitland Avenue Avenue of the Americas SidewalkLast Updated: 04/02/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGasparilla Road Sidewalk (Boca Grande)
Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCLast Updated: 04/02/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove Sidewalks