Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 08/17/2026 Current Phase: Planning and Project Approval
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 08/17/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 08/17/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Harbor Boulevard Intersection Improvements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayManasota Key Beach Renourishment
Last Updated: 08/17/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Mid County Transfer Station Wall
Last Updated: 08/17/2026 Category: County Facilities Current Phase: Design Development
Last Updated: 08/17/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores Boulevard