Disaster Recovery Site - South County Regional Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.
Disaster Recovery Site - South Gulf Cove Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
The site sustained storm damage across several areas including playground shade, pier and boat ramp from multiple storms.
Disaster Recovery Site - Spring Lake Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding caused storm damage to boardwalks, piers, and surrounding infrastructure. Additional impacts included a canoe/kayak pier requiring replacement, scouring of the boat ramp and washouts.
Disaster Recovery Site - St. Paul Linear Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged park amenities, signage and guardrails.
Disaster Recovery Site - Tippecanoe Environmental Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged and removed environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Tringali Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Last Updated: 01/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Mid-County Library Hurricane Repairs
Last Updated: 01/07/2026 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.