Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs
Sheriff Administration and Hardened 911 Facility
Last Updated: 06/12/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurricane Charley which is still suseptible to hurricane damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be located in the same facility.South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 06/12/2025 Category: Bridges Current Phase: Design Development
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072
Supervisor of Elections Warehouse
Last Updated: 06/12/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities.North County Public Works Yard
Last Updated: 06/10/2025 Category: County Facilities Current Phase: Complete
A Public Works presence in North & Mid-County is critical for their operation. The old JB Yard on Kenilworth Blvd has been demoed for the new Charlotte Transit Facility. The County has purchased new property located at 18181 Sinatra Ave in Port Charlotte for the Public Works Yard.Last Updated: 06/09/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIPLast Updated: 06/09/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 06/09/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksLast Updated: 06/09/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.
Fruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 06/09/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas Sidewalk