Gasparilla Road Intersections Signalization
Last Updated: 12/16/2025 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsGreater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 12/16/2025 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 12/16/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Kings Hwy Harborview Rd Intersection Improvements
Last Updated: 12/16/2025 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 12/16/2025 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 12/16/2025 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Midway Boulevard Bridge over North Spring Lake - Bridge Rehabilitation
Last Updated: 12/16/2025 Category: Bridges Current Phase: Construction
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 12/16/2025 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Northwest Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 12/16/2025 Category: Bridges Current Phase: Design Development
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045