Disaster Recovery Site - Spring Lake Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding caused storm damage to boardwalks, piers, and surrounding infrastructure. Additional impacts included a canoe/kayak pier requiring replacement, scouring of the boat ramp and washouts.
Disaster Recovery Site - St. Paul Linear Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged park amenities, signage and guardrails.
Disaster Recovery Site - Tippecanoe Environmental Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged and removed environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Tringali Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Englewood East Amenity Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 05/07/2026 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 37 culvert locations throughout the county that will have these grates installed.Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.Last Updated: 05/07/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.






