Placida West Boat Ramp Expansion
Last Updated: 03/25/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Riverside Boat Ramp Replacement
Last Updated: 03/25/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Disaster Recovery Site - Buena Vista Access Channel
Last Updated: 03/23/2026 Category: Disaster Recovery Site
A significant amount of sediment was pushed into the lagoon creating navigation and environmental issues.
Disaster Recovery Site - Harbour Heights Access Channels
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Hurricane Ian caused land washouts and runoff into MSBU waterways, with strong tides causing shoaling that reduced water depths, restricted flow, and created navigation hazards.
Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.
Disaster Recovery Site - Northwest Port Charlotte Access Channels
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Erosion washed out 150 feet of the northbound lane on David Boulevard. Repairs include replacing the roadway, driveway section, and RCP pipe miters, restoring the drainage easement, installing ditch paving or riprap, and regrading the swale with new sod.
Disaster Recovery Site - Pirate Harbor Waterway System
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Hurricane Ian impacted MSBU waterways and caused land-based washouts and runoff into MSBU-maintained navigable waterways. Strong tidal activity also led to shoaling.
Disaster Recovery Site - South Gulf Cove Access Channel
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways.
Disaster Recovery Site - Suncoast Waterway System
Last Updated: 03/23/2026 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways.