Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
CR 771 Median Landscape and Irrigation Project

CR 771 Median Landscape and Irrigation Project

Last Updated: 08/28/2025 Category: Landscape Current Phase: Construction

CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.

Read More

Fire Station 17

Fire Station 17 Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construction of a new 4 stall apparatus bay Fire Station on the NW corner of Tamiami Trail & Green Gulf Blvd at the Tuckers Grade intersection in Punta Gorda.

Read More

Fire Station 3 Replacement

Fire Station 3 Replacement Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

Read More

Fire Station 6 Replacement

Fire Station 6 Replacement Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

Read More

Placida West Boat Ramp Expansion News Image

Placida West Boat Ramp Expansion Sales Tax Project

Last Updated: 08/28/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.

Read More

Charlotte Harbor CRA - Melbourne Street Multi-Use Path News Image

Charlotte Harbor CRA - Melbourne Street Multi-Use Path

Last Updated: 08/27/2025 Category: Sidewalks Current Phase: Design Development

Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.

Read More

Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk News Image

Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk

Last Updated: 08/27/2025 Category: Roadway Current Phase: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.

Read More

Cochran Boulevard at Veterans Boulevard Intersection Improvements News Image

Cochran Boulevard at Veterans Boulevard Intersection Improvements

Last Updated: 08/27/2025 Category: Roadway Current Phase: Construction

The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.

Read More

Gillot Blvd & Blitman Waterway

Gillot Blvd & Blitman Waterway

Last Updated: 08/27/2025 Category: Roadway Current Phase: Turnover and Closeout

Gillot Blvd roadway reconstruction

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us