Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Old Landfill Road Safety Improvements

Old Landfill Road Safety Improvements

Last Updated: 04/01/2026 Category: Roadway Current Phase: Design Development

Old Landfill Rd safety improvements.

Read More

Peace River Shores Boulevard Road Crossing Pipe Replacements  News Image

Peace River Shores Boulevard Road Crossing Pipe Replacements

Completed 04/01/2026 Category: Roadway

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Peachland Boulevard at Harbor Boulevard Intersection Improvements News Image

Peachland Boulevard at Harbor Boulevard Intersection Improvements

Last Updated: 04/01/2026 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

Read More

Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 04/01/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 04/01/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.

Read More

Sandhill Boulevard Widening News Image

Sandhill Boulevard Widening

Last Updated: 04/01/2026 Category: Roadway Current Phase: Design Development

Sandhill Boulevard Widening

Read More

Sheriff Jail Admin Renovation (with Kitchen and Laundry) News Image

Sheriff Jail Admin Renovation (with Kitchen and Laundry)

Last Updated: 04/01/2026 Current Phase: Planning and Project Approval

 This project will renovate and modernize the Jail Kitchen and Laundry facilities to improve operational efficiency, user-friendliness, and compliance with commercial standards. Work includes redesigning the kitchen layout, upgrading equipment, evaluating options for relocating adjacent administrative space, and improving workflow within both the kitchen and laundry areas. The project will also address aged infrastructure and incorporate design solutions that enhance safety, functionality, and long-term maintainability within the facility.

Read More

Southwest Landfill Operations Building Zemel Rd News Image

Southwest Landfill Operations Building Zemel Rd

Last Updated: 04/01/2026 Current Phase: Planning and Project Approval

Read More

SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project News Image

SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project

Last Updated: 04/01/2026 Category: Landscape Current Phase: Design Development

The county, with funding from FDOT, shall construct and maintain landscaping in the median of SR 776 between Murdock Circle and the Myakka River Bridge.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us