Veterans Boulevard Intersection Improvements
Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIPAlligator Creek Maintenance Dredge
Last Updated: 11/17/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Atwater Street Sidewalk Project
Last Updated: 11/17/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 11/17/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks
Cleveland Avenue Sidewalk Project
Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 11/17/2025 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.
Fruitland Avenue and Avenue of the Americas Sidewalk project
Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout
Fruitland Avenue Avenue of the Americas SidewalkLast Updated: 11/17/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard Pathway