Last Updated: 03/10/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.Last Updated: 03/10/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.Riverside Boat Ramp Replacement
Last Updated: 03/09/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Bayshore Live Oak Park - West Fishing Pier
Last Updated: 03/04/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 03/04/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Bayshore Live Oak Park Seawall ReplacementLast Updated: 03/04/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Cedar Point Pier ReplacementCharlotte Harbor Event Center Seawall Replacement
Last Updated: 03/04/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Charlotte Harbor Event Center Seawall ReplacementDarst Park Shoreline and Boarding Pier Repairs
Last Updated: 03/04/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Darst Park Shoreline and Boarding Pier Repairs
Disaster Recovery Site - Ainger Creek Park
Last Updated: 03/04/2026 Category: Disaster Recovery Site
The site suffered significant waterfront and structural damage, including erosion, seawall displacement, and exposed mangrove roots. Several piers were damaged, along with the boat ramp, storm drain protections, and shoreline. Storm surges caused waterway fill, requiring dredging and reinforcement. Additional damage affected parking bumpers, containers, and signage.






