Tom Adams Bridge Structural Repairs - Design
Last Updated: 04/07/2026 Category: Bridges Current Phase: Design Development
Tom Adams Bridge Structural Repairs - DesignWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 04/07/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementLast Updated: 04/03/2026 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Last Updated: 04/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP
Atwater Street Sidewalk Project
Last Updated: 04/02/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 04/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Last Updated: 04/02/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street Sidewalk