Weir Inspection and Repair Design
Last Updated: 08/17/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Willmington Boulevard Sidewalk
Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkAinger Creek Bridge - Emergency Repair
Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction
Ainger Creek Bridge - Emergency RepairAllapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsAlligator Creek Maintenance Dredge
Last Updated: 08/14/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Ballfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer FieldsBallfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Bayshore Live Oak Park - West Fishing Pier
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park Seawall Replacement