Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Veterans Boulevard Intersection Improvements News Image

Veterans Boulevard Intersection Improvements

Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP

Read More

Alligator Creek Maintenance Dredge News Image

Alligator Creek Maintenance Dredge

Last Updated: 11/17/2025 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 11/17/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 11/17/2025 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Cleveland Avenue Sidewalk Project

Cleveland Avenue Sidewalk Project Sales Tax Project

Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Disaster Recovery Site - Tom Adams Bridge News Image

Disaster Recovery Site - Tom Adams Bridge Disaster Recovery Project Site

Last Updated: 11/17/2025 Category: Disaster Recovery Site

Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.

Read More

Fruitland Avenue and Avenue of the Americas Sidewalk project

Fruitland Avenue and Avenue of the Americas Sidewalk project Sales Tax Project

Last Updated: 11/17/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout

Fruitland Avenue Avenue of the Americas Sidewalk

Read More

Gasparilla Pines Pathway

Gasparilla Pines Pathway

Last Updated: 11/17/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Gasparilla Pines Boulevard Pathway

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us