South County Regional Park Improvements -Design
Completed 04/16/2026 Category: Parks And Recreation
South County Regional Park Playground Replacement
Last Updated: 04/16/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.Last Updated: 04/15/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Completed 04/15/2026 Category: Bridges
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek
Completed 04/15/2026 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063
Bridge Scour Study and Countermeasures
Last Updated: 04/15/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Last Updated: 04/15/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 04/15/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 04/15/2026 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct a multi-use path on Parmely Street from U.S. 41 to Bayshore Road.






