Atwater Street Sidewalk Project
Last Updated: 03/16/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 03/16/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 03/16/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. SidewalkCharlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 03/16/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 03/16/2026 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cleveland Avenue Sidewalk Project
Last Updated: 03/16/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Cochran Boulevard at Veterans Boulevard Intersection Improvements
Completed 03/16/2026 Category: Roadway
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 03/16/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street Sidewalk
Fruitland Avenue and Avenue of the Americas Sidewalk project
Last Updated: 03/16/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout
Fruitland Avenue Avenue of the Americas Sidewalk





