Project Status Updates

Indian Springs Cemetery Bank Stabilization News Image

Indian Springs Cemetery Bank Stabilization

Last Updated: 07/13/2026 Category: Other Current Phase: Construction

Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017

Read More

Indian Trail/Springwater Dr Street Light Replacement

Indian Trail/Springwater Dr Street Light Replacement

Last Updated: 07/13/2026 Category: Roadway Current Phase: Construction

Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old. 

Read More

Manasota Key Beach Renourishment

Manasota Key Beach Renourishment

Last Updated: 07/13/2026

The second major renourishment of the Manasota Key shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Oyster Creek Flow Enhancement News Image

Oyster Creek Flow Enhancement

Last Updated: 07/13/2026 Category: Drainage Current Phase: Design Development

Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.

Read More

Peace River Shores Boulevard Road Crossing Pipe Replacements  News Image

Peace River Shores Boulevard Road Crossing Pipe Replacements

Completed Category: Roadway

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Riverside Drive Road Crossing Pipe Replacements News Image

Riverside Drive Road Crossing Pipe Replacements

Last Updated: 07/13/2026 Category: Roadway Current Phase: Planning and Project Approval

Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor Drive

Read More

Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 07/13/2026 Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Waterway Hurricane Debris Removal-Grant Funded News Image

Waterway Hurricane Debris Removal-Grant Funded

Last Updated: 07/13/2026 Category: Drainage Current Phase: Turnover and Closeout

Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 07/13/2026 Category: Drainage Current Phase: Design Development

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More