Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities RepairsLast Updated: 04/21/2023 Category: County Facilities Current Phase: Complete
Design/Build contract to construct the new Fire Station 10 on Don Pedro Island while assisting in property evaluation.Last Updated: 04/21/2023 Category: County Facilities Current Phase: Complete
Relocate the transit services from Airport Road Annex to a central facility located off Veterans Boulevard. The facility will provide admin support, operations & dispatch personnel.
Last Updated: 04/11/2023 Category: Utilities Current Phase: Complete
This project involves removing and replacing the sewer force mains within the road right of ways and utility easements.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 03/07/2023 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.El Jobean East Wastewater Expansion
Last Updated: 11/15/2022 Category: Utilities Current Phase: Complete
Construction of a wastewater collection system to service approximately 300 properties with sewer service, a water booster pump station and a sewer vacuum station.Quesada Boulevard Wastewater Force Main Replacement
Last Updated: 07/19/2022 Category: Utilities Current Phase: Complete
The project will replace approximately 780 linear feet of 12-inch wastewater force main and approximately 1,841 linear feet of 20-inch wastewater force main that runs along Quesada Boulevard from the Master Lift Station to the Lion Heart waterway.
Family Services Center - Phase 1
Last Updated: 03/21/2022 Category: County Facilities Category: Sales Tax Funded Current Phase: Complete
Design and construct a new Family Services facility to replace the existing facilty as part of a phased master plan approach. The project is the last Tier 1 sales tax project from the 2014 sales tax initiative.Loveland Grand Master Lift Station and 48-inch Gravity Interceptor
Last Updated: 03/10/2022 Category: Utilities Current Phase: Complete
This project is constructing a master lift station and a major 48-inch wastewater gravity interceptor to transfer wastewater to the East Port Water Reclamation Facility (WRF).Easy Street Wastewater Force Main Replacement
Last Updated: 01/03/2022 Category: Utilities Current Phase: Complete
This project will replace of approximately 1,980 linear feet of 6-inch wastewater force main.