Ainger Creek Boat Ramp Replacement
Last Updated: 04/14/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Atwater Street Sidewalk Project
Last Updated: 04/14/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 04/14/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 04/14/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 04/14/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.
Disaster Recovery Site - Hickory Bluff Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Indian Springs Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Lt. Carl Bailey Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.





