Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 01/15/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Last Updated: 01/15/2026 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayKings Hwy Harborview Rd Intersection Improvements
Last Updated: 01/15/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Last Updated: 01/15/2026 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 35 culvert locations throughout the county that will have these grates installed.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 01/15/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Midway Boulevard Bridge over North Spring Lake - Bridge Rehabilitation
Last Updated: 01/15/2026 Category: Bridges Current Phase: Construction
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Northwest Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 01/15/2026 Category: Bridges Current Phase: Design Development
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045Old Landfill Road Safety Improvements
Last Updated: 01/15/2026 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvementsLast Updated: 01/15/2026 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 17 acres of Oyster Creek.





