South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
South Gulf Cove Parallel Locks Project
Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 10/30/2025 Category: Coastal Current Phase: Complete
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 10/30/2025 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 10/30/2025 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementLast Updated: 10/29/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP
Atwater Street Sidewalk Project
Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Buena Vista Waterways Dredging Project
Last Updated: 10/29/2025 Category: Coastal Current Phase: Construction
Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU. The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.