Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Family Services Center - Phase 1
Last Updated: 03/21/2022 Category: County Facilities Category: Sales Tax Funded Current Phase: Complete
Design and construct a new Family Services facility to replace the existing facilty as part of a phased master plan approach. The project is the last Tier 1 sales tax project from the 2014 sales tax initiative.Loveland Grand Master Lift Station and 48-inch Gravity Interceptor
Last Updated: 03/10/2022 Category: Utilities Current Phase: Complete
This project is constructing a master lift station and a major 48-inch wastewater gravity interceptor to transfer wastewater to the East Port Water Reclamation Facility (WRF).Easy Street Wastewater Force Main Replacement
Last Updated: 01/03/2022 Category: Utilities Current Phase: Complete
This project will replace of approximately 1,980 linear feet of 6-inch wastewater force main.Last Updated: 12/22/2021 Category: Utilities Current Phase: Complete
This project includes the construction of the replacement of Lift Station #2. Work also includes replacements of the 6" wastewater forcemain and 8" watermain along Conway Boulevard.Last Updated: 11/05/2021 Category: County Facilities Current Phase: Complete
This project includes renovation and remodeling of the existing Justice Center, primarily within the existing footprint of the building. This work is being constructed in fourteen phases, affecting three of the five floors throughout the facility, plus site related security enhancements.
Port Charlotte Beach Sailing Center
Last Updated: 11/05/2021 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete
This 2014 Tier II Sales Tax Extension project will provide a small boat maintenance garage and workshop area, covered pavilion, secure covered and uncovered boat storage, and required utilities and infrastructure.
Cape Haze Drive Reclaimed Water and Wastewater Force Main
Last Updated: 07/29/2021 Category: Utilities Current Phase: Complete
This project involves upsizing the existing 6" sewer lines to 12" on Cape Haze Drive and adding new 16" reclaimed water lines for future customers.Last Updated: 07/13/2021 Category: County Facilities Category: Sales Tax Funded Current Phase: Complete
Provide a new backup generator, as a supplement to the existing emergency generator, to provide power to the building in the event of an electrical loss to the facility.Fire Station 9 EMS Unit Temporary Facility
Last Updated: 05/14/2021 Category: County Facilities Current Phase: Complete
A mobile structure supporting 24-hour operation for 3 personnel. The facility includes cooking, dayroom and dining area, showers, sleeping quarters, office/computer space, a lockable medical storage room, laundry and emergency power. A second area houses the personal protective equipment with a isolated ventilation system. A covered apparatus parking area will also be constructed to provide protection for the equipment from the environment.