South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 07/09/2026 Category: Bridges Current Phase: Construction
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072Tom Adams Bridge Structural Repairs
Last Updated: 07/09/2026 Category: Bridges Current Phase: Construction
Tom Adams Bridge Structural RepairsWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 07/09/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop Road over Shell Creek and Myrtle Slough Bridge Rehabilitations
Last Updated: 07/09/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridges over Shell Creek and Myrtle SloughLast Updated: 07/06/2026 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.
Disaster Recovery Site - Piper Road Signage/Lighting
Last Updated: 07/06/2026
This project will consist of replacing all streetlight poles felled by Hurricane Ian.Englewood East Amenity Replacement
Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.South County Regional Park Playground Replacement
Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.