Disaster Recovery Site - South County Regional Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.
Disaster Recovery Site - South Gulf Cove Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
The site sustained storm damage across several areas including playground shade, pier and boat ramp from multiple storms.
Disaster Recovery Site - Spring Lake Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding caused storm damage to boardwalks, piers, and surrounding infrastructure. Additional impacts included a canoe/kayak pier requiring replacement, scouring of the boat ramp and washouts.
Disaster Recovery Site - St. Paul Linear Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged park amenities, signage and guardrails.
Disaster Recovery Site - Tippecanoe Environmental Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged and removed environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Tringali Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 01/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Alligator Creek Maintenance Dredge
Last Updated: 01/06/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Buena Vista Waterways Dredging Project
Last Updated: 01/06/2026 Category: Coastal Current Phase: Construction
Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU. The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.