Rampart Boulevard Sidewalk Phase 3
Last Updated: 07/20/2026 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3Willmington Boulevard Sidewalk
Last Updated: 07/20/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkAinger Creek Bridge - Emergency Repair
Last Updated: 07/16/2026 Category: Bridges Current Phase: Construction
Ainger Creek Bridge - Emergency RepairBayshore Live Oak Playground Restroom
Last Updated: 07/16/2026 Current Phase: Planning and Project Approval
The Bayshore Live Oak Playground Restroom Replacement project will provide a new, modern restroom facility to better serve park visitors. The existing structure was damaged during Hurricanes Milton and Helene and is unsafe to repair or reuse. It will be replaced with a durable, code-compliant building designed for safety, accessibility, and ease of maintenance. The upgraded facility will enhance the overall user experience while supporting the long-term functionality and appearance of the park.
Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 07/16/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Sheriff Jail Admin Renovation (with Kitchen and Laundry)
Last Updated: 07/16/2026 Current Phase: Design Development
This project will renovate and modernize the Jail Kitchen and Laundry facilities to improve operational efficiency, user-friendliness, and compliance with commercial standards. Work includes redesigning the kitchen layout, upgrading equipment, evaluating options for relocating adjacent administrative space, and improving workflow within both the kitchen and laundry areas. The project will also address aged infrastructure and incorporate design solutions that enhance safety, functionality, and long-term maintainability within the facility.
Southwest Landfill Operations Building Zemel Rd
Last Updated: 07/16/2026 Current Phase: Design Development
Bridge Scour Study and Countermeasures
Last Updated: 07/15/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 07/15/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.







