Last Updated: 11/18/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkGasparilla Road Intersections Signalization
Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsGillot Blvd & Blitman Waterway
Last Updated: 11/18/2025 Category: Roadway Current Phase: Complete
Gillot Blvd roadway reconstructionGillot Boulevard Landscape and Irrigation Project
Last Updated: 11/18/2025 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayKings Hwy Harborview Rd Intersection Improvements
Last Updated: 11/18/2025 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Last Updated: 11/18/2025 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 17 acres of Oyster Creek.Peachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 11/18/2025 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.








