Caring Way and Brinson Avenue Sidewalks
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks
Cleveland Avenue Sidewalk Project
Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 10/29/2025 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.East Port Water Reclamation Facility Expansion
Last Updated: 10/29/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.
Fruitland Avenue and Avenue of the Americas Sidewalk project
Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas SidewalkLast Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGasparilla Road Sidewalk (Boca Grande)
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCMidway Boulevard Sidewalk (HB41)
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.
Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Construction
Quesada Avenue sidewalk and pedestrian signals