South County Regional Park Playground Replacement
Last Updated: 08/27/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.SR776 / Flamingo Blvd Intersection Improvements
Last Updated: 08/27/2026 Category: Roadway
SR776 / Flamingo Blvd Intersection Improvement project. Underground utility, traffic signal, road work, and sidewalk improvements.Last Updated: 08/27/2026 Category: Sidewalks Current Phase: Design Development
Sun-Trail Multi-purpose pathwayBurnt Store Water Reclamation Facility Expansion
Last Updated: 08/24/2026 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.East Port Water Reclamation Facility Expansion
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Hillsborough Boulevard Water Main Project
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Lakeview/Midway Wastewater Expansion
Last Updated: 08/24/2026 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Last Updated: 08/24/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.2024 Road and Bridge Paving Program
Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving Program