South County Annex Replacement
Last Updated: 08/28/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
The current Annex has reached the end of life, and stands in a high risk flood zone. The project will include master planning the current and future needs of stakeholders as well as site feasibility to determine the best location for a new building. The primary function of the South County Annex is to serve the regional community with governement services that include the Tax Collector, Property Appraiser, Supervisor of Elections and Board of County Commissioners.Last Updated: 08/28/2026 Current Phase: Design Development
Design of a new multi-purpose Special Needs Saferoom and Community Support Facility.
Waterway Hurricane Debris Removal-Grant Funded
Last Updated: 08/28/2026 Category: Drainage Current Phase: Turnover and Closeout
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.Weir Inspection and Repair Design
Last Updated: 08/28/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.
Atwater Street Sidewalk Project
Last Updated: 08/27/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 08/27/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 08/27/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 08/27/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Last Updated: 08/27/2026 Category: Sidewalks Current Phase: Design Development
Deep Creek Blvd. Sidewalk Design