Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 07/30/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Last Updated: 07/30/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 07/30/2026 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 07/30/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
South County Regional Park Playground Replacement
Last Updated: 07/30/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 07/30/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Last Updated: 07/29/2026 Current Phase: Construction
Replacement of boardwalk at Oyster Creek Environmental Park.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsBallfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 07/24/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer Fields