Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 10/27/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 10/27/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvements
Last Updated: 10/27/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Gillot Blvd & Blitman Waterway
Last Updated: 10/27/2025 Category: Roadway Current Phase: Complete
Gillot Blvd roadway reconstructionLast Updated: 10/27/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayLast Updated: 10/27/2025 Category: Parks And Recreation Current Phase: Complete
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions and walking paths.
Peachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 10/27/2025 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 10/27/2025 Category: Roadway Current Phase: Design Development
Sandhill Boulevard WideningVeterans Boulevard at Atwater Intersection Safety Improvements
Last Updated: 10/27/2025 Category: Roadway Current Phase: Design Development
This project includes the design and construction of new turn lanes and traffic signal improvements at the intersection of Veterans Boulevard and Atwater Street.







