Rampart Boulevard Sidewalk Phase 3
Last Updated: 06/15/2026 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3Riverside Drive Road Crossing Pipe Replacements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor DriveLast Updated: 06/15/2026 Category: Roadway Current Phase: Design Development
Sandhill Boulevard WideningLast Updated: 06/15/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Various Intersection Improvements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes, sidewalk modifications, and traffic signal modifications at various intersections in Charlotte County.Veterans Boulevard at Atwater Intersection Safety Improvements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Design Development
This project includes the design and construction of new turn lanes and traffic signal improvements at the intersection of Veterans Boulevard and Atwater Street.Veterans Boulevard Intersection Improvements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 06/15/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWillmington Boulevard Sidewalk
Last Updated: 06/15/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard Sidewalk







