Gillot Boulevard Landscape and Irrigation Project
Last Updated: 06/15/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Last Updated: 06/15/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove SidewalksHarbor Boulevard Intersection Improvements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Last Updated: 06/15/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayManasota Key Beach Renourishment
Last Updated: 06/15/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Midway Boulevard Sidewalk (HB41)
Last Updated: 06/15/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardPeachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 06/15/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Rampart Boulevard Sidewalk Phase 1 and 2
Last Updated: 06/15/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 1 and 2