Last Updated: 06/12/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.Mid-County Library Hurricane Repairs
Completed Category: County Facilities
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Riverside Boat Ramp Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Burnt Store Water Reclamation Facility Expansion
Last Updated: 05/01/2026 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.
Sheriff Administration and Hardened 911 Facility
Completed Category: Sales Tax Funded Category: County Facilities
Design and construction of a new 62,000-square-foot Law Enforcement Administrative Headquarters for the Charlotte County Sheriff’s Office. This modern facility will be located on County-owned land adjacent to the existing District 3 Headquarters and the Impound, Evidence, and Forensics Facility, bringing multiple law enforcement services together into one coordinated campus.
The new headquarters will replace the current leased building, which was originally repaired after Hurricane Charley and remains vulnerable to severe weather. The upgraded facility will meet the needs of a modern, growing law enforcement agency by providing safer, more efficient, and more resilient space for deputies and staff to serve the community. It will also include a new Emergency 911 Communications Center, ensuring reliable emergency response during critical events.
Completed
Sport Court Resurfacing at Tringali Park and Franz Ross ParkLakeview/Midway Wastewater Expansion
Last Updated: 04/27/2026 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.
Supervisor of Elections Warehouse
Completed Category: County Facilities Category: Sales Tax Funded
Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities.