Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Disaster Recovery Site - South County Annex News Image

Disaster Recovery Site - South County Annex Disaster Recovery Project Site

Last Updated: 05/26/2026 Category: Disaster Recovery Site

Read More

Disaster Recovery Site - West County Mini Transfer Station News Image

Disaster Recovery Site - West County Mini Transfer Station Disaster Recovery Project Site

Last Updated: 05/26/2026 Category: Disaster Recovery Site

Read More

Disaster Recovery Site - West Port Water Reclamation Facility News Image

Disaster Recovery Site - West Port Water Reclamation Facility Disaster Recovery Project Site

Last Updated: 05/26/2026 Category: Disaster Recovery Site

Hurricane Ian caused significant damage throughout the wastewater treatment plant.

Read More

Disaster Recovery Site - Zemel Road Landfill News Image

Disaster Recovery Site - Zemel Road Landfill Disaster Recovery Project Site

Last Updated: 05/26/2026 Category: Disaster Recovery Site

Read More

Ackerman Wastewater Expansion News Image

Ackerman Wastewater Expansion

Last Updated: 05/11/2026 Category: Utilities Current Phase: Construction

Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.

Read More

Cultural Center Replacement News Image

Cultural Center Replacement

Last Updated: 05/07/2026 Category: County Facilities Current Phase: Planning and Project Approval

The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.

Read More

Oyster Creek Boardwalk News Image

Oyster Creek Boardwalk

Last Updated: 05/07/2026 Current Phase: Design Development

Replacement of boardwalk at Oyster Creek Environmental Park.

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Burnt Store Water Reclamation Facility Expansion News Image

Burnt Store Water Reclamation Facility Expansion

Last Updated: 05/01/2026 Category: Utilities Current Phase: Design Development

This expansion project will increase wastewater treatment capacity for the Burnt Store service area.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us