Disaster Recovery Site - Englewood Beach and Chadwick Park
Last Updated: 03/02/2026 Category: Disaster Recovery Site
The site experienced erosion and widespread damage to playgrounds, park amenities, boardwalks, sidewalks, pavilions, buildings, lighting, asphalt, curbing and fencing caused by storm surge, strong winds, flooding, and windborne debris from multiple hurricanes.Gillot Boulevard Landscape and Irrigation Project
Last Updated: 03/02/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Harbor Boulevard Intersection Improvements
Last Updated: 03/02/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Last Updated: 03/02/2026 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 37 culvert locations throughout the county that will have these grates installed.SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project
Last Updated: 03/02/2026 Category: Landscape Current Phase: Design Development
The county, with funding from FDOT, shall construct and maintain landscaping in the median of SR 776 between Murdock Circle and the Myakka River Bridge.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 03/02/2026 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.Weir Inspection and Repair Design
Last Updated: 03/02/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Last Updated: 02/26/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Last Updated: 02/26/2026 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.