Last Updated: 02/05/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.
Disaster Recovery Site - Roads and Bridges - FHWA
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Hurricane impacts caused widespread damage to roadways, bridges, and drainage systems across multiple sites.
Disaster Recovery Site - Roads and Bridges - Non-FHWA
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 02/03/2026 Current Phase: Planning and Project Approval
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 02/03/2026
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Completed 01/27/2026 Category: Coastal
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.
Disaster Recovery Site - Burnt Store Water Treatment Plant
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged many mechanical components and fencing to the Burnt Store Water Treatment Plant.
Disaster Recovery Site - Gulf Cove Water Booster Station
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Milton damaged the building's roof.