South Gulf Cove Bridge Rehabilitations

Project Description

South Gulf Cove has four (4) bridges needing design and construction services to implement the FDOT maintenance and repair items for each of the respective bridges. The design services shall also include designing ADA-compliant sidewalks across each of the bridges. The sidewalk design shall include transitions from the bridges to the existing sidewalks including the traverse of intersecting roadways.  

Project Location

All four bridges are located in South Gulf Cove-

Keystone Boulevard over the Santa Cruz Waterway.  #014053

Appleton Boulevard over the Santa Cruz Waterway.  #014054

Keystone Boulevard over the President's Waterway.  #014055

Ingraham Boulevard over the President's Waterway.  #014056

Location Map Attached

Latest Updates

The project is complete.

Budget

Phase Cost
Design $199,895
Construction $4,590,209.62
Funding source(s): South Gulf Cove MSBU

Schedule

Phase Estimated Start Date Forecast Completion Actual Completion
Design Development 08/26/2021 08/28/2023 10/11/2023
Construction 05/20/2024 06/18/2025 06/18/2025
Turnover & Closeout 06/30/2025 08/29/2025 09/05/2025

Supporting Materials

Project Phase
Project Complete

Last Updated
09/10/2025

Project Manager
Kelly Slaughter

Public Relations
Chad Ray
Email Public Relations

Project Number
2021000302

Sponsor Department
Public Works Engineering

Design Engineer/Architect
Bridging Solutions

Construction Contractor
Thomas Marine Construction