Hillsborough Boulevard Water Main Project

Project Description

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

The Peace River Manasota Water Authority’s Regional Integrated Loop Phase 2B Pipeline is a 42-inch steel potable water transmission main that will start at the Authority's existing 42-inch Regional Interconnect and end at the Gulf Coast Booster Station. 

This segment of the regional integrated loop system will boost regional resiliency, bidirectional water transfer capability and lays the groundwork for the southern regional loop with future pipeline projects.

Project Location

Hillsborough Boulevard from Yorkshire St. to US 41

Project Impacts

Atwater St. south of the Hillsborough Blvd. intersection will be closed starting at 7 a.m. Tuesday, May 28, through Friday, June 7. Detour signs will be in place to aid in travel through this area. Travelers are encouraged to choose an alternate route when possible.

Latest Updates

Construction has begun. 

Crews have installed the 42-inch and 8-inch pipe from Serris Drive to Santa Marta Street and they are now restoring this section.

Budget

Phase Cost
Construction $5,045110.89
Total Budget $5,045110.89
Funding source(s): Capital Improvement Funds 

Schedule

Phase Estimated Start Date Forecast Completion Actual Completion
Construction 03/04/2024

Supporting Materials

Hillsborough Boulevard Water Main Project Project Image

Project Phase
Construction

Last Updated
08/15/2024

Project Manager
Mike Martindell

Public Relations
Caroline Wannall
Email Public Relations

Sponsor Department
Utilities

Design Engineer/Architect
Kimley Horn

Construction Contractor
Woodruff & Sons