Disaster Recovery Site - Live Oak Point Park

This page is a Disaster Recovery Site of multiple projects related to Storm Damages.

Project Description

Storm surges and rising water caused extensive erosion, washouts, and structural damage across the site. Restroom foundations have been undermined, and two restroom door grates are damaged. Multiple boardwalks and piers, including T-dock, west-of-bridge, and water taxi piers, require full concrete replacement with design, along with damaged handrails and side/top rails. Sidewalks and pavers are heavily damaged, including reinforced concrete, unclassified fill, gravel, geotextile fabric, and brick pavers, with potential mitigation involving concrete replacement. Rip rap embankments, seawalls, and erosion control structures require repair or rebuild.

Project Managers:

  • Lonne Moore

Project Location

5100 Tamiami Trail, Charlotte Harbor, FL 33980

Latest Updates

Description of Work Estimated Start Estimated Completion Storm Event

Signage
(Complete)

Ian, Milton

Buildings
(Planning)

6/2/2025 5/4/2028 Milton

Park amenities
(Planning)

9/8/2025 9/8/2030 Idalia, Milton

Sidewalks, boardwalks, piers, dock
(Planning)

9/8/2025 9/8/2030 Ian,Milton

Utilities
(Planning)

9/8/2025 9/8/2030 Ian, Milton

Erosion
(Planning)

9/8/2025 9/8/2030 Idalia, Milton

Fencing
(Planning)

9/8/2025 9/8/2030 Milton

Budget

Phase Cost
Total Budget $6,464,727.00
Funding source(s):

FEMA Public Assistance

Insurance

Disaster Recovery Site - Live Oak Point Park Project Image

Last Updated
11/03/2025