Project Description
Storm surges and rising water caused extensive erosion, washouts, and structural damage across the site. Restroom foundations have been undermined, and two restroom door grates are damaged. Multiple boardwalks and piers, including T-dock, west-of-bridge, and water taxi piers, require full concrete replacement with design, along with damaged handrails and side/top rails. Sidewalks and pavers are heavily damaged, including reinforced concrete, unclassified fill, gravel, geotextile fabric, and brick pavers, with potential mitigation involving concrete replacement. Rip rap embankments, seawalls, and erosion control structures require repair or rebuild.
Project Managers:
- Lonne Moore
Project Location
5100 Tamiami Trail, Charlotte Harbor, FL 33980Latest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event |
|---|---|---|---|
|
Signage |
Ian, Milton | ||
|
Buildings |
6/2/2025 | 5/4/2028 | Milton |
|
Park amenities |
9/8/2025 | 9/8/2030 | Idalia, Milton |
|
Sidewalks, boardwalks, piers, dock |
9/8/2025 | 9/8/2030 | Ian,Milton |
|
Utilities |
9/8/2025 | 9/8/2030 | Ian, Milton |
|
Erosion |
9/8/2025 | 9/8/2030 | Idalia, Milton |
|
Fencing |
9/8/2025 | 9/8/2030 | Milton |
Budget
| Phase | Cost |
|---|---|
| Total Budget | $6,464,727.00 |
FEMA Public Assistance
Insurance
Last Updated
11/03/2025