Riverside Boat Ramp Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Englewood East Amenity Replacement
Completed Category: Parks And Recreation
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Ainger Creek Boat Ramp Replacement
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsBallfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer FieldsBallfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Bayshore Live Oak Park - West Fishing Pier
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park Seawall Replacement






