Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

South County Regional Park Improvements -Design

South County Regional Park Improvements -Design Sales Tax Project

Completed Category: Parks And Recreation

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Englewood East Amenity Replacement News Image

Englewood East Amenity Replacement

Completed Category: Parks And Recreation

Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development

This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.

Read More

Allapatchee Shores Park - Stormwater and Parking Enhancements

Allapatchee Shores Park - Stormwater and Parking Enhancements

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction

Allapatchee Shores Park - Stormwater and Parking Enhancements

Read More

Ballfield LED Lighting Conversion-Centennial Park Soccer Fields

Ballfield LED Lighting Conversion-Centennial Park Soccer Fields

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction

Ballfield LED Lighting Conversion-CP Soccer Fields

Read More

Ballfield LED Lighting Conversion-HARP Baseball Field #4

Ballfield LED Lighting Conversion-HARP Baseball Field #4

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction

Ballfield LED Lighting Conversion-HARP Baseball Field #4

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More

Bayshore Live Oak Park Seawall Replacement

Bayshore Live Oak Park Seawall Replacement

Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development

Bayshore Live Oak Park Seawall Replacement

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us